Your AI copilotfor every meeting.

Capture every customer call — screen recording, transcript, screenshots, slides — in 40+ languages. Recordings live on your Mac or your Google Drive, never on our servers.

Works with Zoom, Google Meet, Microsoft Teams — and anything else on your screen. No bot ever joins the call.

  • 500+hours of calls
  • 700+users

as of September 3, 2026

Pavleur
00:14:32
PavleurYouEN
Let's walk through the Q2 plan…
Acme — MaríaES
Before we continue, can we talk about multilingual support?
PavleurYouEN
Of course. We transcribe in 40+ languages, switching live…
Acme — MaríaES
Perfect. And the data — where is it stored?
PavleurYouEN
On your Mac, or your Google Drive. Never on our servers.
Ask about your call
⌘ ↵ Assist

Never lose a single thing from a customer call

Recording, transcript, screenshots, slides, decisions, action items — assembled into one customer page per call.

2/2 Saved
Andrew
LIVE
REC00:14:32
Capturing screen

Screen recording

Your screen and the call audio, recorded together and saved to the customer's page.

LiveTranscript
10:14:32
SarahEN
Let's start with the Q2 review. Margins are up 3%, conversion dropped 8%.
10:14:48
AndrewEN
What's driving the conversion drop?
10:15:02
SarahEN
Mostly the new pricing tier. Want to A/B test before EOM?
10:15:18
AndrewEN
Send me the pricing PDF first — I'll loop in legal.
10:15:30
SarahEN
On it. Also Acme asked about multilingual support.

Searchable transcript

Every word, timestamped, in the language it was spoken.

+1
slide-04.png
Q2 Pricing Tier
14:32 · Q2 review
#roadmap#pricing#multilingual
Auto-tagged
All captures synced to your Drive

Screenshots, kept

Every screen-share frame worth keeping, captured and tagged automatically.

📎 Q2-roadmapPDF
📎 Pricing-v3PPTX
📎 notion.soLINK

Slides + attachments

Decks, PDFs, links shared in the call land in the customer page.

✓ Decision: ship i18n in Q2→ Action: send pricing PDF📅 Next call: 14 days

Decisions + actions

AI extracts what was decided and what you committed to — never re-asked.

One-page recap

A structured summary you can paste straight into Slack, Notion, or your CRM.

Built for every language your customers speak

Most call assistants quietly fall back to English. Pavleur transcribes in the language the call is actually in.

Acme Corp — Q2 review · Live transcript
LIVE
Sarah[EN]00:02

Hi Andrew — thanks for joining the Q2 review.

Andrew[EN]00:09

Of course. Quick thing — do you mind if we switch to Spanish?

Sarah[ES]00:14

Claro, sin problema. ¿Empezamos con los números?

Andrew[ES]00:21

Perfecto. El crecimiento del Q2 fue del 32%.

Detected language EN ES
Languages
  • EnglishEN
  • EspañolES
  • PortuguêsPT
  • 日本語JA
  • DeutschDE
  • FrançaisFR
+ 34 more
40+languages supported95%transcription accuracyLivespeaker-detected language switching

If your customer switches mid-call from English to Spanish, the transcript switches with them.

Your customer data stays with you

Pavleur doesn't store your call recordings. They live on your Mac, or in your Google Drive — wherever you choose. We can't leak what we never store.

Pavleur · Settings → Storage
v2.1
Save call recording to
My Mac
~/Pavleur/Recordings · 412 GB free
Google Drive
your-account@workspace.com
Encrypted at rest
AES-256 · per-file keys
Never trained on
Your data is excluded from all model training
Auto-delete after 90 days
Off · keep recordings indefinitely
Pavleur servers · 0 bytes stored
We can't leak what we never store.
storage://local · synced just now
  • Recordings on your storage
  • Never sold, never shared
  • Never trained on
  • Exportable, deletable
Quiet by design

Present in the call. Absent from everything else.

Pavleur is for the conversation between you and your customer. It stays out of the screen-share, out of the participant list, and out of your way.

Always at hand

Always at hand

A translucent overlay you can glance at without breaking eye contact. Hide it with ⌘ B; bring it back with the same shortcut. Pavleur is a quiet helper, not a wall in the middle of the call.

Out of your screen-share (to you)
Out of your screen-share (to your customer)

Out of your screen-share

When you share your screen with a customer, Pavleur's overlay never appears in what they see or in any recording — your transcript and AI suggestions stay yours.

No bot in the meeting

No bot in the meeting

Pavleur runs locally on your Mac. It never joins the call as a participant — no Pavleur entry in attendee lists, no extra guest, no trace on the customer's side.

Illustrative beta scenarios

What happens when Pavleur is in every meeting

Illustrative scenarios from our private beta — composite examples, not verified reviews.

I haven't taken notes in a meeting in months. Pavleur's recaps are better than mine ever were, and the action items land in my Notion automatically.

Senior Engineer, Bangalore

Illustrative composite — not a customer quote

English is my third language. When a senior PM asks a tough question in a standup, Pavleur's assist panel is already there with a draft. I don't freeze anymore.

Product Manager, São Paulo

Illustrative composite — not a customer quote

Search keeps saving me. 'What did we decide about the auth migration?' — seconds later, the exact transcript is on screen.

Tech Lead, Berlin

Illustrative composite — not a customer quote

I open Pavleur before every call automatically. The recap to Slack means my team sees what we agreed before I've even closed the tab.

Engineering Manager, Singapore

Illustrative composite — not a customer quote

Example stories for demo purposes

Start

Pavleur Logo

for

free.

Your customer-call memory, on every plan. No tricks, no upsells, no data sold.

  • AES-256 encryption
  • 0 bytes stored on our servers
  • Never used for AI training
MonthlyAnnually
Start free

Free

Free

Capture every customer call on your laptop. No credit card.

  • Screen recording, transcript, and screenshots for every call
  • Stored on your Mac (or your own Google Drive)
  • Up to 10 calls per month
  • English transcription
  • One-page recap per call
Privacy included

Pro

$37.5/ month

Unlimited calls, every language your customers speak.

Everything in Free, plus:

  • Unlimited screen recordings, transcripts, screenshots
  • 40+ languages with live code-switch
  • AI-extracted decisions and action items
  • Slides + attachments auto-attached to the call
  • Search every word ever said in a call
  • Export per-customer archive in one click
Pay once, use forever

Pro Lifetime

$449
$899-50%

Lifetime access to everything in Pro.

Everything in Pro, plus:

  • Pay once, use forever
  • All future Pro features included
  • Founding-customer Slack channel

This is a monthly subscription — you will be charged every month.

All payments are final and non-refundable due to AI processing costs. Terms of Service

Questions about Pavleur

Everything you need to know about using Pavleur in your day-to-day

The AI Entrepreneur

Your resume gets you the meeting. Pavleur wins it.

The old career ladder collapsed — that doesn't make you obsolete, it makes you early. Pavleur keeps you sharp in both games: the interviews that pay the bills today, and the client calls that build what's next. The book shows you how to stop needing either.

Read The AI Entrepreneur

From aiescu — Pavleur is one of the tools of the era.

Pavleur — Your AI Copilot for Every Meeting