v0.3.0May 13, 2026 (Sprint B)
- -Real blog with 12 launch posts on meeting copilot topics
- -Glossary with 40 entries covering meetings, AI tools, workplace English, and privacy
- -4 long-form guides on meeting productivity and AI tool adoption
- -5 competitor comparisons (Otter, Read.ai, Fireflies, Granola, Krisp)
- -Salary Negotiation Calculator ported from sibling product GeekBye
- -LegacyRouteBanner routing interview-prep intent to GeekBye
- -Auth UI localized across es / fr / pt / de / ja
- -Product changelog timeline page now live
v0.2.0May 12, 2026 (Vitamin Reposition)
- -Repositioned from "AI interview coach" to "AI copilot for every meeting"
- -New Free / Pro ($49/mo or $348/yr) / Lifetime ($500 one-time) pricing
- -Hero, features, FAQ, and SEO rewritten for meeting-copilot frame
- -New 4-feature section: transcribe, assist, recap, search
- -Demo prompt updated to standup context
- -Existing Pro $37.50 and Plus $199 subscribers grandfathered for 12 months
v0.1.0May 8, 2026 (Production Launch)
- -Initial production release on pavleur.com
- -Stripe checkout flow (test + live mode)
- -6-locale UI shipped (en, es, fr, pt, de, ja)
- -Newsletter capture across all routes
- -Auth flow with Google OAuth + Email OTP via NextAuth v4
- -Customer billing portal integration
- -Coming Soon stub pages for content sections
- -PostHog production analytics wired
v0.0.1May 6, 2026 (Tech Stack Migration)
- -Migrated from Pages Router to App Router
- -Full TypeScript migration across the codebase
- -NextAuth v4 integration with JWT session strategy
- -next-intl localization scaffolding
- -Vitest unit tests + Playwright E2E infrastructure
- -Tailwind design system with HSL CSS variable tokens